Square 1 Precision Lighting®, Inc. Field Installed Job Conditions

1) High voltage GTO cable is provided by Square 1. The cable pull and the P.V.C. or aluminum conduit is to be provided by electrical contractor. (GTO cable is the connecting wire between the transformer and the ends of each neon/cold cathode run.)

2) Non-plenum transformer enclosure provided by Square 1, installed by electrical contractor.

3) 120 Volt primary transformers provided by Square 1.

4) Miscellaneous glass mounting hardware provided by Square 1.

5) Permits attained and permit fees paid (if required) by electrical contractor.

6) Square 1 Precision Lighting, Inc. shall supply luminous tube glass, and all other specialty mounting hardware. All installation labor to be provided by electrical contractor.